• About   |
  • Advertise |
  • Contact Us
No Result
View All Result
The Second Angle (TSA Magazine)
Advertise
  • Infotainment
    • Sports
    • People
    • Inspiring
  • Entertainment
    • Lifestyle
    • Home & Decoration
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology
The Second Angle
No Result
View All Result
  • Infotainment
  • Entertainment
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology
Advertisement Advertisement Advertisement
ADVERTISEMENT
Home News

Vijaywada: Eight out of 12 thermal units at NTTPS, RTPP to be decommissioned in a few years in a phased manner 

by TSA Desk
August 27, 2022
in News
Reading Time: 3 mins read
Vijaywada: Eight out of 12 thermal units at NTTPS, RTPP to be decommissioned in a few years in a phased manner 
Share on FacebookShare on WhatsApp
Advertisement Advertisement Advertisement
ADVERTISEMENT
3 min readGAdd The Second Angle as a preferred source on Google
Key takeaways
Energy Department is aware of its commitment and will take necessary steps as and when required, said a top officialEnergy Department is aware of its commitment and will take necessary steps as and when required, said a top officialWhile focusing on the speedy completion of the new units (2X800 Megawatts) at Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) and Dr.

[ad_1]

Energy Department is aware of its commitment and will take necessary steps as and when required, said a top official

Energy Department is aware of its commitment and will take necessary steps as and when required, said a top official

Centre, Odisha spar over fertilizer shortage Also readCentre, Odisha spar over fertilizer shortage 

VIJAYAWADA

While focusing on the speedy completion of the new units (2X800 Megawatts) at Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) and Dr. Narla Tatarao Thermal Power Station (NTTPS), the Energy Department is duly working out a plan to decommission the ageing coal-fired power plants as mandated by the Ministry of Power (MoP). However, since shutting down the obsolete ones in a hurry will cripple the ability to meet the surging demand for electricity, it has been decided to start phasing out the units older than 25 years, one at a time but only after achieving stabilisation of the aggregate installed capacity including the above two new units.

In the meantime, constant efforts are being made to comply with the air quality norms laid down under the National Clean Air Program, lest the failure to do so should attract massive penalties.

As desulphurisation of flue gas entails huge expenditure, it is being conditioned through ammonia dosing which is a proven technique to bring down the suspended particulate matter in the air. 

Six out of seven units of NTTPS and two out of five units of Rayalaseema Thermal Power Plant (RTPP) are older than 25 years facing mandatory decommissioning.

All other thermal power units in the State, including those of NTPC and the Hinduja Group (both at Visakhapatnam) and SDSTPS were commissioned after the year 2002. 

The thermal plants are supposed to install FGD (flue gas  desulphurisation) units to control emissions but since they are prohibitively expensive, and there are certain other extraneous factors, the Ministry of Environment, Forest and Climate Change has taken a lenient view of the compliance with pollution norms to be followed by thermal plants across the country and had already deferred the deadlines on quite a few occasions.  

As both the NTTPS and RTPP are categorised as ‘remaining plants’ (located beyond the 10 kilometre radius of critically polluted areas/non-attainment cities), they have at least longer deadlines to meet the pollution norms. As of now, the deadline is 2024.   

Speaking to The Hindu, a top official of the Energy Department said the possibility of closing down old thermal units is being explored but the State could not afford to rush through it as otherwise there would be a major disruption.

“We will phase out old units but not before stabilising the new units of SDSTPS and NTTPS as the demand should be met 24X7, 365 days. The total base load has to be ensured and there should always be the fall – back option of renewable energy. Then there are costs and various other factors. Right now, we are under no pressure to close the old units but are aware of our commitment and will take necessary steps at an appropriate time”, the official said. 

Also Read | Sluggish pace of BoP work becomes a stumbling block for completion of the new 800-MW unit of NTTPS 

[ad_2]

Source link

Enjoyed this story?Share it with your friends
WhatsAppLinkedInXFacebookEmail
See more TSA Mag stories on GoogleAdd us as a preferred source and our stories will show up more often in your Top Stories.
GAdd The Second Angle as a preferred source on Google
ShareSend
Tweet
Previous Post

Centre, Odisha spar over fertilizer shortage 

Next Post

Mysore varsity authority over colleges will get limited now

Related Posts

Meloni, Macron and the 2024 G7 Abortion Row: What Happened
News

Meloni, Macron and the 2024 G7 Abortion Row: What Happened

Explainer on the Meloni Macron G7 row of June 2024: the viral 'death stare' clip, the abortion wording dispute in...

Read moreDetails
PicsArt_11-02-09.24.24
Entertainment

Happy Birthday Shah Rukh Khan: A Heartfelt Letter as SRK Turns 61

Shah Rukh Khan birthday letter: as SRK turns 61 on 2 November 2026, a fan looks back at DDLJ, Jawan,...

Read moreDetails
Tvasta 3D printed house
News

Tvasta: The IIT Madras Startup Behind India’s 3D Printed House

Tvasta, an IIT Madras startup, built India's first 3D printed house in 2021. How its concrete printing works, what it...

Read moreDetails
International Mother Language Day: History, 2026 Theme and Facts
News

International Mother Language Day: History, 2026 Theme and Facts

International Mother Language Day on 21 February: its 1952 Dhaka origins, UNESCO's role, the 2026 theme and what NEP 2020...

Read moreDetails
This Diwali, RVCJ & Honda, in Association with Chinese Wok, Unveil 'WRONG NUMBER REBOOT' – A Perfect Blend of Love, Laughter, & Entertainment
News

Wrong Number Reboot: RVCJ Web Series, Episodes, Where to Watch

Wrong Number Reboot is RVCJ's five-episode romcom web series with Honda and Chinese Wok. Release dates, story, partners and where...

Read moreDetails
South Africa Travel Guide: Expect A Vacation Filled With Wildlife And Breathtaking Views
News

South Africa Travel Guide 2026: Visa, Safari and Top Things to Do

South Africa travel guide for Indians in 2026: visa rules, best time to visit, what to pack and top things...

Read moreDetails
Load More
Next Post
Mysore varsity authority over colleges will get limited now

Mysore varsity authority over colleges will get limited now

About

The Second Angle

The Second Angle (TSA Mag) is an infotainment and lifestyle magazine covering entertainment, travel, technology, health, education and finance.

Important Links

  • About The Second Angle
  • Advertise With Us
  • Editorial Policy
  • Privacy Policy
  • Terms and Conditions
  • Contact Us
  • Careers
  • Newsletter

Explore

  • Infotainment
  • Entertainment
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology
Advertise with us

© 2017-2026. The Second Angle. All Rights Reserved. Developed and Managed by Squarebase.io

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Infotainment
    • Sports
    • People
    • Inspiring
  • Entertainment
    • Lifestyle
    • Home & Decoration
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology

© 2017-2026. The Second Angle. All Rights Reserved. Developed and Managed by Squarebase.io

We use cookies to keep TSA fast and relevant. Read our Privacy Policy.