• About   |
  • Submit Guest Post |
  • Contact Us
No Result
View All Result
The Second Angle (TSA Magazine)
Advertise
  • Infotainment
    • Sports
    • People
    • Inspiring
  • Entertainment
    • Lifestyle
    • Home & Decoration
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology
The Second Angle
No Result
View All Result
  • Infotainment
  • Entertainment
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology
Advertisement
ADVERTISEMENT
Lexitoto
Slot Demo
RTP SLOT
Lexitoto
Aplikasi Lexitoto
RTP Lexitoto
RTP IDN Slot
RTP PG Soft
RTP Habanero
RTP Microgaming
RTP TopTrend Gaming
RTP GMW
RTP Nolimit City
RTP Booster
Slot Demo Bambu4d
Slot Demo PG Soft
Slot Demo Habanero
Situ Togel Online
Situs Togel Amanah
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Prediksi Togel Lexitoto
Slot Demo PG Soft
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Lexitoto
Vietnam Lottery
Syair HK
Octagon Lottery
Bandar Situs Togel
Situs Slot Gacor
Bocoran Slot Gacor
Lexitoto
Togel Toto Macau
Situs Togel Macau
Prediksi Macau
Bambu4d
Prediksi Togel Bambu4d
Slot Gacor Bet Kecil
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Situs Togel Online
Aplikasi Bambu4d
Aplikasi RTP Slot
Aplikasi RTP Booster
Aplikasi Slot Demo
Aplikasi Prediksi Togel
RTP Bambu4d
RTP IDN Slot
RTP PG Soft
RTP Habanero
RTP Microgaming
RTP TopTrend Gaming
RTP GMW
RTP Nolimit City
RTP Playstar
RTP Booster
Slot Demo Bambu4d
Slot Demo PG Soft
Slot Demo Habanero
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Bambu4d
Prediksi Togel Bambu4d
Bambu4d
RTP Slot
Live Draw HK
Live Draw SDY
Lexitoto Togel
Prediksi Syair Macau
Data SDY
Bandar Togel
https://bluewaveslogistics.com/
Situs Toto
Prediksi Syair Taiwan
RTP Slot
Situs Toto
Prediksi Syair Macau
Slot Gacor
RTP Slot Gacor
Prediksi Syair HK
Prediksi Syair HK
Prediksi Syair SGP
Prediksi SGP
Prediksi Syair Cambodia
Prediksi Cambodia
Prediksi Cambodia
Prediksi Syair China
Prediksi Syair China
Prediksi Syair SDY
Prediksi PCSO
Syair SDY
SYAIR HK
Situs Togel
Paito SGP
Paito HK
Paito SDY
Prediksi Macau
Live Draw Cambodia
Prediksi Jepang
Situs Togel
Live Draw Macau
Live Draw Cambodia
Live SGP
lexitoto
Live Macau
Live RTP Slot
RTP SLOT
hinterlaces.com RTP Slot
Slot Demo
Rtp Slot
showfactory.in
https://tuniversity.tn/
situs toto
lexitoto
slot deposit pulsa
lexitoto
Data Pengeluaran HK
Prediksi China
Prediksi Cambodia
Toto Slot
Home News

Fukushima wastewater has been released, but other challenges, like removing melted nuclear fuel, remain

TSA Desk by TSA Desk
August 29, 2023
in News
Reading Time: 5 mins read
Fukushima wastewater has been released, but other challenges, like removing melted nuclear fuel, remain
Share on FacebookShare on WhatsApp
Advertisement Advertisement Advertisement
ADVERTISEMENT

RelatedPosts

This Diwali, RVCJ & Honda, in Association with Chinese Wok, Unveil 'WRONG NUMBER REBOOT' – A Perfect Blend of Love, Laughter, & Entertainment

This Diwali, RVCJ & Honda, in Association with Chinese Wok, Unveil ‘WRONG NUMBER REBOOT’ – A Perfect Blend of Love, Laughter, & Entertainment

Polish Man Sentenced To Four Months, Deported From Denmark For June Assault On Danish Prime Minister

Polish Man Sentenced To Four Months, Deported From Denmark For June Assault On Danish Prime Minister

  • Table of Contents
    • Japan's Fukushima Daiichi nuclear power plant has begun releasing its treated radioactive wastewater into the Pacific Ocean following a devastating tsunami that caused a nuclear meltdown in 2011.
    • While releasing the Fukushima wastewater was seen as a milestone for decommissioning the nuclear plant, more challenges lie ahead at the Japanese facility.
    • The Fukushima nuclear plant still carries 880 tons of deadly melted nuclear fuel, but removal of the debris poses as an extreme challenge, according to a spokesperson of the Tokyo Electric Power Company Holdings.
    Japan’s Fukushima Daiichi nuclear power plant has begun releasing its treated radioactive wastewater into the Pacific Ocean following a devastating tsunami that caused a nuclear meltdown in 2011.
  • While releasing the Fukushima wastewater was seen as a milestone for decommissioning the nuclear plant, more challenges lie ahead at the Japanese facility.
  • The Fukushima nuclear plant still carries 880 tons of deadly melted nuclear fuel, but removal of the debris poses as an extreme challenge, according to a spokesperson of the Tokyo Electric Power Company Holdings.

At a small section of the Fukushima Daiichi nuclear plant’s central control room, the treated water transfer switch is on. A graph on a computer monitor nearby shows a steady decrease of water levels as treated radioactive Fukushima wastewater is diluted and released into the Pacific Ocean.

In the coastal area of the plant, two seawater pumps are in action, gushing torrents of seawater through sky blue pipes into the big header where the treated water, which comes down through a much thinner black pipe from the hilltop tanks, is diluted hundreds of times before the release.

The sound of the treated and diluted radioactive water flowing into an underground secondary pool was heard from beneath the ground as media, including The Associated Press, toured the plant in northeastern Japan for the first time since the water release began.

JAPAN VOWS TO SUPPORT FISHERIES DURING COUNTRY’S DECADES-LONG PROCESS OF RELEASING FUKUSHIMA NUCLEAR WASTE

“The best way to eliminate the contaminated water is to remove the melted fuel debris,” said Tokyo Electric Power Company Holdings spokesperson Kenichi Takahara, who escorted Sunday’s media tour for foreign media.

But Takahara said the scarcity of information from inside the nuclear reactors makes planning and development of the necessary robotic technology and a facility for the melted fuel removal extremely difficult.

“Removal of the melted fuel debris is not like we can just take it out and be finished,” he said.

The projected decades-long release of treated water has been strongly opposed by fishing groups and criticized by neighboring countries. China immediately banned imports of seafood from Japan in response. In Seoul, thousands of South Koreans rallied over the weekend to condemn the release, demanding Japan to keep it in tanks.

Japan’s Foreign Ministry on Sunday issued a travel advisory to Japanese citizens to use extra caution while in China. It said act of harassment, including massive phone calls, have targeted to the Japanese embassy, consulate and Japanese schools in China, and it urged Japanese in China to stay away from those places and from protests of the water release, and not to talk loudly in Japanese to avoid attention.

protestors hold cards

South Korean lawmakers hold placards that read “Withdraw the discharge of the wastewater from Fukushima nuclear power plant into the ocean” during a protest in Iwaki, Fukushima prefecture, on Aug. 27, 2023.  (AP Photo)

Managing the ever-growing volume of radioactive wastewater held in more than 1,000 tanks has been a safety risk and a burden since the plant was wrecked by a massive earthquake and tsunami on March 11, 2011. The tanks are already filled to 98% of their 1.37 million-ton capacity.

Releasing the water into the sea is a milestone for the decommissioning of the plant, which is expected to take decades. But it is just the beginning of the challenges ahead, such as the removal of the fatally radioactive melted fuel debris that remains in the three damaged reactors, a daunting task if ever accomplished.

The plant’s operator, Tokyo Electric Power Company Holdings, started releasing the first batch of 7,800 tons from 10 of the group B tanks, among the least radioactive water at the plant.

They say the water is treated and diluted to levels that are safer than international standards, and so far, testing by TEPCO and government agencies has found no detectable radioactivity in seawater and fish samples taken after the release.

The Japanese government and TEPCO say releasing the water is an unavoidable step in the decommissioning of the plant.

JAPAN TO RELEASE FUKUSHIMA NUCLEAR WASTEWATER INTO OCEAN ON THURSDAY

Since the earthquake and tsunami destroyed the plant’s cooling systems and caused three reactors to melt, highly contaminated cooling water applied to the damaged reactors has leaked continuously to the buildings’ basements and mixed with groundwater. Some water is recycled to cool the nuclear fuel, while the rest is stored in the tanks.

The release started at the daily pace of 460 tons and moves slowly. TEPCO plans to release 31,200 tons of treated water by the end of March 2024, which would empty only 10 tanks because the site will continue to produce radioactive water.

The pace will quicken later and about 1/3 of the tanks will be removed over the next 10 years, freeing up space for the plant’s decommissioning, said TEPCO executive Junichi Matsumoto, who is in charge of the treated water release. The water will be released over 30 years, but as long as melted fuel stays in the reactors, it requires cooling water under the current prospect.

About 880 tons of radioactive melted nuclear fuel remain inside the reactors. Robotic probes have provided some information but the status of the melted debris remains largely unknown, and the amount could be even larger, says Takahara, the TEPCO spokesman.

CLICK HERE TO GET THE FOX NEWS APP

A trial removal of melted debris using a giant remote-controlled robotic arm is set to begin in Unit 2 later this year, though it will be a very small amount, Takahara said.

Spent fuel removal from the Unit 1 reactor’s cooling pool is set to start in 2027. The reactor top is still covered with debris from the explosion 12 years ago and needs to be cleaned up after putting a protective cover to contain radioactive dust.

Inside the worst-hit Unit 1, most of its reactor core melted and fell to the bottom of the primary containment chamber and possibly farther into the concrete basement. A robotic probe sent inside the Unit 1 primary containment chamber has found that its pedestal — the main supporting structure directly under its core — was extensively damaged.

Most of its thick concrete exterior was missing, exposing the internal steel reinforcement, prompting regulators to ask TEPCO to make risk assessment.

The government has stuck to its initial 30-to-40-year target for completing the decommissioning, without defining what that means. Rushing the schedule could cause more radiation exposure to workers and more environmental damage. Some experts say it would be impossible to remove all the melted fuel debris by 2051 and would take 50-100 years, if achieved at all.

 

 

(this story has not been edited by TSA Mag staff and is published from a syndicated feed.)

 

ShareSendTweet

Related Posts

This Diwali, RVCJ & Honda, in Association with Chinese Wok, Unveil 'WRONG NUMBER REBOOT' – A Perfect Blend of Love, Laughter, & Entertainment
News

This Diwali, RVCJ & Honda, in Association with Chinese Wok, Unveil ‘WRONG NUMBER REBOOT’ – A Perfect Blend of Love, Laughter, & Entertainment

This Diwali, RVCJ is back with a bang! RVCJ & Honda in association with Chinese Wok, is excited to announce...

Read moreDetails
Polish Man Sentenced To Four Months, Deported From Denmark For June Assault On Danish Prime Minister
News

Polish Man Sentenced To Four Months, Deported From Denmark For June Assault On Danish Prime Minister

A Polish man on Wednesday was sentenced to four months in jail for assault on Danish Prime Minister as well...

Read moreDetails
Egypt Asks Its Airlines To Avoid Iranian Airspace For Three Hours On Thursday
News

Egypt Asks Its Airlines To Avoid Iranian Airspace For Three Hours On Thursday

Egypt instructed all of its airlines to avoid Iranian airspace for three hours in the early morning on Thursday amid...

Read moreDetails
2 Dead, 2 Trapped In Wreckage After Partial Collapse Of A Hotel On Mosel River, Germany
News

2 Dead, 2 Trapped In Wreckage After Partial Collapse Of A Hotel On Mosel River, Germany

Two people have been confirmed dead following the partial collapse of a hotel on Mosel River. The incident occurred in...

Read moreDetails
Nobel Laureate Tapped To Lead Bangladesh After Embattled PM's Ouster
News

Nobel Laureate Tapped To Lead Bangladesh After Embattled PM’s Ouster

Nobel laureate Muhammad Yunus has been selected as the temporary head of the Bangladeshi government following longtime Prime Minister Sheikh...

Read moreDetails
The Atomic Bomb Was Created Under A Secret Government Project, And Was Soon After Dropped On A Japanese City To End WWII
News

The Atomic Bomb Was Created Under A Secret Government Project, And Was Soon After Dropped On A Japanese City To End WWII

The atomic bombs instantly took thousands of lives and thousands more in the aftermath of radiation and injury.

Read moreDetails
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest

5 Best Places To Visit In Europe

5 Best Places To Visit In Europe

7 Movies Where Everything Becomes Alright In The End

7 Movies Where Everything Becomes Alright In The End

10 Best Dishes To Try Out In Grenada

10 Best Dishes To Try Out In Grenada

ADVERTISEMENT

About

The Second Angle

The Second Angle (TSA) Magazine covers a broad spectrum of topics including Entertainment, Lifestyle, education, Crypto, iGaming, Technology, fashion, beauty, relationships, celebrities, wellness, travel, and food. It also features user-generated content in the form of tips, guest post, forums, polls, contests and other interactive articles.

Important Links

  • About
  • Guest Post
  • Privacy Policy
  • Terms
  • Contact Us
  • Newsletter
ADVERTISEMENT

© 2017-23. The Second Angle. All Rights Reserved. Developed and Managed by SquareBase.io

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Infotainment
    • Sports
    • People
    • Inspiring
  • Entertainment
    • Lifestyle
    • Home & Decoration
  • Buzz
  • Education
  • Travel
  • Finance
  • Healthcare
  • Technology

© 2017-23. The Second Angle. All Rights Reserved. Developed and Managed by SquareBase.io

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.